17
3KW model setting range is from 22.0V to 28.5V and increment of
each click is 0.5V.
5KW model setting range is from 44.0V to 57.0V and increment of
each click is 1.0V.
13
Setting voltage point back
to battery mode when
selecting “SBU” (SBU
priority) or “SUB” (Solar
first) in program 01
3KW model: The setting range is from 24.0V to 32.0V and
increment of each click is 0.5V.
Battery fully charged
27.0V (default)
13
Setting voltage point back
to battery mode when
selecting “SBU” (SBU
priority) or “SUB” (Solar
first) in program 01
5KW model: The setting range is from 48.0V to 64.0V and
increment of each click is 1.0V.
Battery fully charged
54.0V (default)
16
Solar energy priority:
To configure solar energy
priority for battery and load
NOTE:
In case of battery
keep discharging to cause
battery damaged, inverter
will charge battery at 1~2A
in line mode
SbL: Solar energy for
battery first
UCb: Allow utility to charge
battery (Default)
Solar energy charges battery first
and allow the utility to charge
battery.
SbL: Solar energy for
battery first
UdC: Disallow utility to
charge battery
Solar energy charge battery first
and disallow the utility to charge
battery.
SLb: Solar energy for load
first
UCb: Allow utility to charge
battery
Solar energy provides power to the
load first and also allow the utility to
charge battery.