Installation
Refer to the photo below:
4. Provide a 3 foot/1 meter service loop in the power supply cable to service the machine
5. Route the power cable from the rear of the machine to the terminal block making sure
the cable does not touch the booster heater.
6. Connect the power cable to the terminal block bracket using a suitable strain relief
connector.
7. Connect the power wires according to the wiring diagrams for either single phase or
three phase operation.
8. Return the main terminal block bracket to its original position making sure the power
cable does not touch the booster tank. Install the retaining screws.
9. Swing the chemical pump bracket and the chemical board back into position and
secure with the existing fasteners.
Connecting Incoming Power to the Main Terminal Block
for 1PH and 3PH
Main Terminal Block Cover
Main Terminal Block
Summary of Contents for 601HRG
Page 43: ...35 Digital Temperature Display Board...
Page 44: ...36 Blank Page This Page Intentionally Left Blank...
Page 46: ...38 Wash Pump Motor Assembly 1 11 12 2 3 4 5 7 8 9 10 6 13 14 15...
Page 51: ...43 43 Blank Page This Page Intentionally Left Blank...
Page 54: ...46 Fill Solenoid Valve 1 2 3 4 9 5 6 7 8...
Page 56: ...48 Final Rinse Piping 1 2 2 10 7 2 1 1 1 1 1 8 9 4 6 5...
Page 62: ...54 Booster Heater 3 8 2 2 1 4 5 7 6 9 10 12 11 14 13 11 16 15...
Page 68: ...60 Power Input Block 1 2 3 4 5 6 7 8...
Page 70: ...62 Timer Control Board Assembly Rear View Front View 1 10 2 4 4 5 6 2 4 7 8 9 11 12 13 3...
Page 74: ...66 Control Panel 10 11 12 13 14 3 2 1 4 5 6 7 9 8 8 9...
Page 76: ...68 Panels 7 8 10 1 2 3 4 5 6 9...
Page 78: ...70 Door Assembly 1 10 4 5 6 6 7 7 9 9 8 10 2 3 3 5...
Page 80: ...72 Dish Racks Line Strainer PRV 1 2 3 4...
Page 82: ...74 74 Electrical Schematic SINGLE PHASE THREE PHASE 6 AMP FUSE...
Page 84: ...76 Blank Page This Page Intentionally Left Blank...