![Moyer Diebel 383HT Installation, Operation And Maintenance Manual Download Page 9](http://html1.mh-extra.com/html/moyer-diebel/383ht/383ht_installation-operation-and-maintenance-manual_1842795009.webp)
Receiving
1. Compare the installation site utility connections with the dishwasher utility connections and
make sure they are the same.
2. Level the machine using the four leveling feet. Level side-to-side and front-to-back.
3. Plumbing connections must be made before the electrical installation begins.
4. The dishwasher can be installed as a free-standing unit or under a counter-top. The typical
counter-top height in most locations is 34" [86cm].
5. It is highly recommended that the underside of the counter-top be clad in metal.
6. Under counter installations should provide storage space for the dishwasher chemical
supply containers. Do not elevate the containers above the finished floor.
7. Chemical supply containers should be placed as close to the machine as possible.
8. The chemical tubing taped to the back of the machine must be repositioned before
permanently placing the machine.
9. Place the dishwasher in its permanent location.
10. Remove the lower front panel in preparation for
utility installations.
Receiving/Placement/Installation Codes
1.
Inspect the outside of the dishwasher carton for signs of damage.
2.
Remove the carton and inspect the dishwasher for damage.
3.
Check for any options or accessories that may have shipped with your
dishwasher.
4.
Register by fax using the form at the front of this manual or online at:
http://www.moyerdiebel.com/service
for the USA.
http://www.championindustries.com/warranty-registration
for Canada.
CAUTION:
Be careful when lifting and moving the machine to avoid damage.
Placement
Fig. 2 -
Level the machine.
0
60
10
20
40
30
50
psi
LEV
EL
LEVEL
LEVEL ADJUSTMENT
Fig. 1 -
Do not elevate chemical containers
1
Summary of Contents for 383HT
Page 29: ...Timing Chart 21...
Page 30: ...Electrical Schematic SINGLE PHASE 22...
Page 31: ...23...
Page 32: ...24...