![Moyer Diebel 383HT M2 Installation, Operation, Cleaning And Maintenance Manual Download Page 15](http://html1.mh-extra.com/html/moyer-diebel/383ht-m2/383ht-m2_installation-operation-cleaning-and-maintenance-manual_1842796015.webp)
Installation
Electrical Connection
(continued)
A
B
Fig. 6
GROUND LUG
STRAIN-RELIEF
KNOCKOUT
B
A
3
Fig. 7
L1
L2
N
L1
L2
NEUTRAL
208/240V
115V
115V
G
Fig. 8
4
REMOVE THE LEFT SCREW ON THE
FRONT LIP OF THE TERMINAL BOX.
LIFT AND REMOVE THE COVER
TO ACCESS THE TERMINAL BLOCK.
A
B
A 30" / 76 cm SERVICE
LOOP MUST BE PROVIDED
BEHIND THE UNIT FOR
SERVICING.
STOP
STOP
THREAD THE POWER CABLE
THROUGH THE MIDDLE
SLOT IN THE REAR PANEL.
SECURE THE CABLE TO THE
TERMINAL BOX USING THE
PROPER STRAIN RELIEF.
A
B
208-240V / 60Hz / 1
Ø
115V SPLIT CONNECTION
SINGLE PHASE - THREE WIRE PLUS GROUND
WHICH INCLUDES A CURRENT CARRYING
NEUTRAL WIRE RATED MIN 190
°
F (88
°
C).
CONNECT THE INCOMING
POWER AS SHOWN IN FIG. 8.
7
2
TERMINAL
ENCLOSURE
Summary of Contents for 383HT M2
Page 30: ...Timing Chart 22...
Page 31: ...23 SINGLE PHASE...
Page 33: ...25 Pump Motor 10 12 13 14 9 8 7 6 5 4 3 2 1 11 15...
Page 35: ...27 Booster 1 1 7 3 5 6 8 9 10 11 11 12 4 2 3 3 4 3...
Page 37: ...29 Control Panel 1 3 3 4 7 7 5 5 8 4 2 9 1 1 2 1 3 1 4 1 6 10 0 1 6 1 5 1...
Page 39: ...31 Power Wiring Box 4 12 9 11 3 8 7 6 5 13 1 8 2 10...
Page 41: ...33 Fill Valve 1 5 4 3 2...
Page 47: ...39 Panels and Door 1 2 3 5 4 7 7 8 9 11 12 15 10 6 6 16 17 13 14...
Page 49: ...41 Upper Tank 1 2 3 4 5 6 7 7 17 8 10 14 13 11 12 9 15 16...
Page 51: ...43 2 1 7 11 3 4 6 5 5 7 7 8 9 11 12 8 9 10 13 Tank Rear...
Page 53: ...Chemical Pumps 2 3 6 7 1 4 10 3 4 17 8 9 12 13 15 14 45 11 21 19 18 20 5 15 5...
Page 55: ...47 Dish Racks PRV 1 2 3...
Page 57: ...49 Blank Page This Page Intentionally Left Blank...