ASSEMBLING THE EQUIPMENT
18
STEP 1 - RTE
LIST OF PARTS
TOOLS
Lock the nut
DESCRIPTION
A - Right Upright
DESCRIPTION
QTD.
1 - Hex Head Screw. Tab.
Hex. Int. - M12X20
4
DESCRIPTION
QTD.
2 - Flat Washer - M12
4
Allen no.8
1
2
1
2
100%
Connector cables
WARNING!
Position the column as shown to the side,
and tighten the screws.
Take care that the cables are
not damaged during assembly.
A
Summary of Contents for RTE
Page 2: ......
Page 4: ...INDEX ...
Page 6: ......
Page 7: ...IMPORTANT INFORMATION ABOUT SAFETY ...
Page 9: ...INFORMATION ABOUT SAFETY 09 ...
Page 10: ......
Page 11: ...GETTING TO KNOW THE EQUIPMENT ...
Page 14: ......
Page 15: ...ASSEMBLING THE EQUIPMENT ...
Page 22: ......
Page 23: ...OPERATIONAL INSTRUCTIONS ...
Page 34: ......
Page 35: ...MAINTENANCE ...
Page 36: ...MAINTENANCE 36 ...
Page 37: ...MAINTENANCE 37 ...
Page 39: ......
Page 40: ...WARRANTY ...
Page 43: ......
Page 46: ......
Page 50: ......
Page 51: ...INFORMACIÓN SOBRE SEGURIDAD ...
Page 54: ......
Page 55: ...CONOCIENDO EL EQUIPO ...
Page 58: ......
Page 59: ...MONTAJE DEL EQUIPO ...
Page 66: ......
Page 67: ...INSTRUCCIONES DE OPERACIÓN ...
Page 78: ......
Page 79: ...MANTENIMIENTO ...
Page 80: ...MANTENIMIENTO 36 ...
Page 81: ...MANTENIMIENTO 37 ...
Page 82: ...38 ...
Page 83: ......
Page 84: ...GARANTÍA ...
Page 85: ...41 ...
Page 86: ...42 ...
Page 87: ......