
©2019 Moustache Model Works, LLC
23
20cc DHC
-
2 Beaver Instruction Manual
23.
Cut a 7
13/16”
(198mm) length of 6mm
x 13mm stick and glue in place on the
front side of Bulkhead 3.
No Photo
26.
Using a sharp hobby knife and a
straightedge, score the fuselage sides
at the forward edge of Bulkhead 2,
where the tabs stick into the sides.
You only need to cut about halfway
through the outer ply. This step is to
make it easier to bend the sides in-
ward to attach to the Motor Box Top
and to Bulkhead 1.
24.
Glue the magnet holders on the back
side of the Overhead Bulkhead.
25.
Glue the 10mm DIA magnets into
place in the Overhead Bulkhead, then
glue the Overhead Bulkhead into
place.
31.
Install the wing tube sleeve. It should
be flush to the fuselage sides on both
sides.
32.
Flip the fuselage upside
-
down to install the Fuselage Bottom. Apply a small shot of CA
accelerator to the circled locations of the bottom sheet before assembly to help the CA
“
grab
”
as the sheeting is wrapped around the slightly curved Bulkheads 2.5 and 2.
27.
Bend the sides inward and glue to the
Motor Box Top. You will hear a slight
cracking of the wood as it bends.
30.
Install the Cabin Angle Frames.
28.
Install Bulkhead 1, etched label for-
ward. Note the fuselage sides insert
into the long tabs on either side of the
bulkhead.
29.
Run a bead of either thin or medium
CA over the score lines you just made
on the fuselage sides for strength.