20cc DHC
-
2 Beaver Instruction Manual
17.
Place the firewall and the motor box top in place to get comfortable with how it fits together.
18.
Remove the motor box top, the firewall, and one motor box side.
19.
Glue the firewall in place with 30
-
minute epoxy. Apply glue down the contacting area of
one motor box side, put it back in place. Next apply glue to the bottom edge of the firewall
and put it in place, then follow with the remaining motor box side. At this point you may
want to use some tape on the bottom corners on the side and bottom to ensure a snug
joint. Finally, put some glue along the top of the firewall and install the motor box top.
Large C
-
clamps can be used to apply pressure vertically and horizontally. Once satisfied
with the joint alignment at the firewall, apply medium CA to the remaining joints.
Motor Box Assembly for
Gas (Petrol) Power
The engine mounting rails are pre
-
drilled for mounting the DLE
-
20,
non
-
RA version. An alternate set
of engine mounting rails that are
not pre
-
drilled are provided for
those using different engines. In
this case, substitute the alternate
rails in the following steps, then drill
the required engine mounting holes
at a later point, once the fuselage is
more complete. As drawn, both
sets of rails provide 2° of right
thrust and 2° of down thrust.
For reference, the face of the prop
drive washer on the engine should
be approximately 1
1/2”
(38mm)
forward of the motor box.
15.
Laminate the engine mount doublers
onto the engine mounts using medium
CA. Pay attention to left and right, up
and down. The doublers attach to the
top sides of the mounts.
16.
Glue the engine mounts to the Motor
Box Sides using epoxy.
17.
Install the 4mm blind nuts to the top
sides of the engine mount doublers
using epoxy.
18.
Set the engine separator in place on
the floor, then one at a time glue the
motor box side assemblies to the floor.
The key joint in this step is getting the
bottom edge of the Motor Box Sides
flat against the floor.
19.
Slide Bulkhead 2 into place, then glue
the Motor Box Top into place.
20.
Glue Bulkhead 2 into place.
Fuselage Assembly,
continued
21.
Glue Bulkheads 3 and 4 in place on
the floor. Use a square to keep them
approximately perpendicular to the
floor.
No Photo
22.
Glue the fuselage sides in place, ap-
plying glue along the joints with Bulk-
heads 3 and 4, and along the floor
from Bulkhead 2.5 aft. Wait until these
joints are solid before gluing the sides
to bulkhead 2 and to the floor between
bulkheads 2.5 and 2.