
A
B
E
G
D
A
F
C
B
Colonoscope Control Section and
Endoscope Connector Holder
In-Line
Connector
Proximal
Clamp Closed
A
Proximal
Clamp Open
B
B
Inflation
Hub Luer
Connector
C
Loading Fixture
Channel
E
Inflation Hub
Connector
C
Oversleeve
D
11
MOTUS GI PURE-VU SYSTEM INSTRUCTIONS FOR USE
FIGURE 6:
Connect the control box air line tubing (A) to the inflation hub (B) and turn ON the inflation control box
power (E). Then place the colonoscope connector (C) and control section (F) on the Loading Fixture. Rotate the
colonoscope holders (G) to lock. Ensure the colonoscope air/water, auxiliary water port, suction and biopsy valves
(D) are in place and secure.
4.2.2. Oversleeve Assembly
(cont...)
FIGURE 5:
Place the Loading Fixture on a flat surface. Ensure that the colonoscope control section and endoscope
connector holders are in the open position. Open the proximal clamp (B). Place the Oversleeve inflation hub
connector facing up (C), ensure that the inflation hub luer connector is properly aligned and secured in the clamp,
close and lock the proximal clamp (B). Place the Oversleeve (D) into the Loading Fixture channel (E).