Hardware Preparation
http://www.mcg.mot.com/literature
1-9
1
Hardware Preparation
There are a number of items to check or tasks to perform before you apply
power to the chassis. These items include, but are not limited to, the items
summarized in the following table.
Table 1-3. Hardware Preparation Items
Item
Location of Instructions
VME bus backplane jumpers
Chapter 4
of this manual
Install modules
User’s manual(s) for the respective
module(s)
Install cables (as required)
MVME956AC installation
instructions, also other user’s
manual(s) as applicable
Chassis rack mounting
Chapter 2
of this manual
Jumper options on modules used in
this chassis (as required)
User’s manual(s) for the respective
module(s)
For peripheral drives: Select
jumper options on disk drive(s)
System manual, kit instructions