Prepare Site for Equipment Arrival
Chapter 2: Site Preparation
Prepare Site for Equipment Arrival
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
■
This section covers various topics not all of which are needed at every site. Based on the site
characteristics, execute the steps that apply to your site. Before installing the equipment, do the
following to ensure the safety of installation personnel and to protect the equipment.
Description
This information covers various topics not all of which are needed at every site. Based on the
site characteristics execute the steps that apply to your site. Before installing the equipment, do
the following to ensure the safety of installation personnel and to protect the equipment.
Equipment Arrival
Before the equipment arrives, indicate to the transport company an area (staging area) at
the site where the equipment can be unloaded and, if necessary, unpacked. The equipment
should be carefully delivered to the site, along with all equipment dollies and padding required
to safely move the equipment from the unloading area to the installation site. The following
should also be provided, outdoor weather protection, temporary lighting and power for lighting
and power tools.
Procedure to prepare the site for the equipment
Procedure 2-1
Procedure to prepare the site for the GAP equipment
1
Consult with the site manager.
2
Locate the outdoor demarcation blocks for external (or internal, for rack
installations) utilities. Verify that they are shown on any site engineering
documents, and determine the required cable routing back to the equipment
frames.
3
Verify the following:
•
AC or battery power is available and meets the site documentation
specifications
•
Concrete pad, floor, outdoor pole and/or wall mounting structures are
installed (if needed) and meet specifications in the site engineering
documents
•
Outdoor cable runs are installed and meet local building codes
•
Customer input termination tie points are available
Continued
2-6
68P09286A73-1
PRELIMINARY - UNDER DEVELOPMENT
JUL 2007
Summary of Contents for MOTOwi4 25600
Page 9: ...List of Figures vi 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Page 11: ...List of Tables viii 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Page 27: ...FCC requirements 16 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Page 28: ...Chapter 1 Overview 68P09286A73 1 1 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Page 84: ...Chapter 6 Optional Equipment 68P09286A73 1 6 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Page 86: ...Chapter 7 What s Next and Cleanup 68P09286A73 1 7 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Page 94: ...Chapter 8 XXXXXXXXXXXX 68P09286A73 1 8 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Page 96: ...Chapter 9 XXXXXXXXXXXX 68P09286A73 1 9 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Page 98: ...Chapter 10 XXXXXXXXXXXX 68P09286A73 1 10 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Page 100: ...Chapter 11 XXXXXXXXXXXX 68P09286A73 1 11 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Page 103: ...A 2 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Page 105: ...B 2 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Page 106: ...Appendix C MMI Cable Fabrication 68P09286A73 1 C 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...