![Motorola MOTOwi4 25600 Hardware Installation Download Page 40](http://html.mh-extra.com/html/motorola/motowi4-25600/motowi4-25600_hardware-installation_247421040.webp)
Ground Based Access Point (GAP) Hardware Installation
Initial site inspection
•
General safety inspection to ensure a safe working environment for personnel and
protection of equipment.
•
Lighting and power for installation and maintenance personnel.
•
Configuration of the GAP cabinets, either side - by - side or stacked.
•
Appropriate general space to install the GAP cabinets.
•
Availability of appropriate electrical ground connections for the GAP equipment.
•
Access to, and routing of; input power, RF output, and general interconnection cabling
space for the GAP cabinets.
•
Availability of appropriate rated input power; battery or main line voltage and current.
•
Configuration and position of the concrete pad(s) to mount GAP cabinets.
•
Level surface and the appropriate weight bearing characteristics of the concrete pad(s).
•
Mounting structure for cable routing or environmental conditions; direct concrete
mounting or with bottom I-beam support.
•
Minimum distance to access the front and rear of the GAP equipment.
•
Minimum clearance to open doors and panels on the front and rear of the GAP cabinets.
•
Minimum distance for air flow circulation around the GAP equipment.
•
Staging area for equipment arrival, unpacking, and transportation equipment for moving
the GAP cabinets..
•
Compliance with any site engineering documentation and specifications.
68P09286A73-1
2-5
PRELIMINARY - UNDER DEVELOPMENT
JUL 2007
Summary of Contents for MOTOwi4 25600
Page 9: ...List of Figures vi 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Page 11: ...List of Tables viii 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Page 27: ...FCC requirements 16 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Page 28: ...Chapter 1 Overview 68P09286A73 1 1 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Page 84: ...Chapter 6 Optional Equipment 68P09286A73 1 6 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Page 86: ...Chapter 7 What s Next and Cleanup 68P09286A73 1 7 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Page 94: ...Chapter 8 XXXXXXXXXXXX 68P09286A73 1 8 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Page 96: ...Chapter 9 XXXXXXXXXXXX 68P09286A73 1 9 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Page 98: ...Chapter 10 XXXXXXXXXXXX 68P09286A73 1 10 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Page 100: ...Chapter 11 XXXXXXXXXXXX 68P09286A73 1 11 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...
Page 103: ...A 2 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Page 105: ...B 2 68P09286A73 1 PRELIMINARY UNDER DEVELOPMENT JUL 2007 ...
Page 106: ...Appendix C MMI Cable Fabrication 68P09286A73 1 C 1 JUL 2007 PRELIMINARY UNDER DEVELOPMENT ...