3-1
3
3
Starting Up the CPN5365
This chapter gives you information about the power-up procedure and the
CPN5365 switches and indicators.
Applying Power to the System
After you verify that all necessary hardware preparation is complete and
all connections are made correctly, you can apply power to the system.
When you are ready to apply power to the CPN5365:
❏
Verify that the chassis power supply voltage setting matches the
voltage present in the country of use (if the power supply in your
system is not auto-sensing)
❏
On powering up, the CPN5365 displays the PhoenixBIOS banner
and then runs a memory test
Switches and Indicators
You can access a pushbutton reset switch through the CPN5365 Single
Board Computer front panel and program this switch for hard or soft reset.
There are two indicators on the CPN5365 front panel:
❏
Blue EXT LED indicating hot swap status
❏
Green PWR LED indicating power on