
Motorola Solutions AP-7131N-FGR Access Point Installation Guide
4
2
Hardware Installation
An AP-7131N-FGR access point installation includes mounting the access point, connecting the
access point to the network, connecting antennae and applying power. Installation procedures vary
for different environments.
The AP-7131N-FGR model access point has the following port designations:
•
GE1/POE - LAN port
•
GE2 - WAN Port
2.1 Precautions
Before installing the AP-7131N-FGR, verify the following:
•
Do not install in wet or dusty areas without additional protection. Contact a Motorola
Solutions representative for more information.
•
Verify the environment has a continuous temperature range between -20° C to 50° C.
2.2 Requirements
The minimum installation requirements for a single-cell, peer-to-peer network:
•
An AP-7131N-FGR model access point (in either of its two available dual-radio models)
•
48 Volt Power Supply (50-14000-247R) or Power Injector (AP-PSBIAS-1P3-AFR)
•
A power outlet
•
Dual-band antennae or an antenna specifically supporting the AP’s 2.4 or 5 GHz band
2.3 Package Contents
Check package contents for the correct model AP-7131N-FGR and applicable accessories. Each
available configuration (at a minimum), contains:
•
AP-7131N-FGR model access point (accessories dependent on SKU ordered)
•
AP-7131N-FGR Install Guide (this guide)
•
Wall mount screw and anchor kit
•
Accessories Bag (4 rubber feet and a LED light pipe and badge with label for above the
ceiling installations)
Summary of Contents for AP-7131N-FGR
Page 1: ...INSTALLATION Motorola Solutions AP 7131N FGR Access Point Installation Guide ...
Page 2: ......
Page 4: ......
Page 16: ...Motorola Solutions AP 7131N FGR Access Point Installation Guide 12 ...
Page 64: ...Motorola Solutions AP 7131N FGR Access Point Installation Guide 60 ...
Page 65: ......