Motorline professional mbm6 Installer And User Manual Download Page 3

2A

2B

09•

05•

06•

03•

13•

10•

08•

04•

14•

01•

11•

02•

07•

12•

01

1170 mm

840 mm

100 mm

321 mm

296 mm

53 mm

214 mm

EN

EN

Inside the package you will find the following components:

The main dimensions of the MBM6 barrier are:

02. PACKAGE

INSIDE PACKAGE

01

• 01 electromechanical  

02

• 01 control board 

03

• 02 4 channel MX4SP transmitter

04

• 01 aluminium boom

05

• 01 boom support

06

• 01 MF1 exterir photocells set

07

• 02 fastening metal plates 

08

• 01 boom fastening metal plate

09

• 04 M16 bolts with bushings

10

• 04 boom fastening screws 

11

• 02 boom support fastening screws 

12

• 01 RGB LED board

13

• 01 cover for boom 

14

• 01 installer and user’s manual

TECHNICAL SPECIFICATIONS

03. OPERATOR

MBM6 230V

MBM6 110V

MBM6 24V

• Barrier’s Power Supply

230V 50/60Hz

230V 50/60Hz

230V 50/60Hz

• Motor’s Voltage

AC 230V

AC 110V

24v DC

• Power

90W

90W

80W

• Current

0,75 A 

0,75 A 

0,75 A

• RPM

2800RPM

2800 RPM

1400 RPM

• Noise level

<65dB

<65dB

<65dB

• Working temperature

-25°C a 55°C

-25°C a 55°C

-25°C a 55°C

• Thermal protection

120°C

120°C

-

• Protection level

IP55

IP55

IP55

• Working frequency

80%

80%

Intense

• Opening/Closing time

3 - 6 s

3 - 6 s

3 - 6 s

• Capacitor

10μF

25μF

-

Summary of Contents for mbm6

Page 1: ...v4 0 REV 01 2019 EN INSTALLER AND USER S MANUAL BARRIER MBM6...

Page 2: ...el of mechanical assemblies in doors and gates and control board programmation He should also be able to perform electrical connections in compliance with all applicable regulations The installer shou...

Page 3: ...9 04 M16 bolts with bushings 10 04 boom fastening screws 11 02 boom support fastening screws 12 01 RGB LED board 13 01 cover for boom 14 01 installer and user s manual TECHNICAL SPECIFICATIONS 03 OPER...

Page 4: ...ier s warning light During pausing time while openned warning light emits BLUE light During closing course warning light emits RED light 01 Open the door using the key supplied with the barrier Rotate...

Page 5: ...the barrier 02 Solder the bolts with bushings on the foundation while the cement is still fresh It is also necessary to respect the dimensions on the side image when soldering the bolts so that the ba...

Page 6: ...om is fixed use the cover to hide these fastening parts After assembling the boom you must define the length of it so that you can fix the boom support as visible on the image above When the boom s le...

Page 7: ...on phase 1 as shown on the above image Let it go and it must maintain on that position or rising very slowly If the boom starts to descend or rise adjust the springs untill you can make the boom becom...

Page 8: ...fixed to the boom s rotation shaft that when openning or closing will activate the micro switches also installed This will cause the control board to stop the barrier when the micro switches are activ...

Reviews: