7A
1 2
1 2
5
6
5
3 4
3 4
8
7
1
3
2
4
3
3
3
2
6
7
8
5
5
4
8
6
7
1
EN
03. INSTALLATION
FIXING ON THE CEILING
Double and individual consoles as well as screws, washers
and bushings
are not
included in the kit.
FIXING HOLDER SUPPORT
Fasten to double consoles using M12 bolts with
washers
(another option see detail A).
Fasten to individual console using M12 bolts with
washers
(another option see detail B).
If the Awning is between 5501mm and 6500mm,
place an individual console centered with the
holder.
DETAIL A
DETAIL C
DETAIL B
APPLY THE COFRE
Apply the holder support to
the wall bracket.
APPLY INFERIOR
PROTECTION PROFILE
Remove the screw and the cover
from one side
(see detail C).
Open the awning with the crank
at 500mm and apply the inferior
protection profile.
FIXING HOLDER SUPPORT
Attach the
ISO7380 screws (M10 x 30)
with the
washers to secure the supports.
Apply
DIN933 screws (M8x75)
with the washers and
tighten until fully secured.
Attach the profile into the slot.
Raise the profile until it is possible to tighten the
screw.
Finally, replace the cover on the sides of the cofre
with the screws.