~22~
Checking period
Check item
Gen-
eral
che-
cking
First
Month
Or
Initial
500km
Home
Per6 per12
Months months
Or or
5000km 1000km
Office
Per1 per3 per12
Months months months
Or or or
1000km 2500km 10000km
Judgement
standard
Remark
Performance,
noise
○
○
○
○
○
Low speed,
Accleration
○
○
○
○
○
Idling:1700
±
100rpm
Exhaustion
○
○
○
○
○
○
Check the clolr
Or exhausting
-air
Air cleaner
○
○
○
○
○
Cylinder, cyl-
inder head inlet
Pipe, locking
Condition
○
Locking torque
Cylinder head:
(cold)
1.0-1.2kg/m
inlet pipe
L
cp;d)
1.0-1.2kg/m
Engine
parts
Compression
pressure
○
○
Using stating
Motor.
12kg/c
㎡
(750rpm)
Oil leakage
○
○
○
○
○
Oil quantity,
Dirty
○
○
○
○
○
Change every
1000kml
Oil quantity,
○
○
Lubr-
icat-
Ion
Syst-
em
Oil filter
○
○
○
○
Change every
5000km
Fuel quantity
○
Fuel leakage
○
○
○
○
○
Carburetor
Parts dirty
○
○
○
○
○
Carburetor thr-
ottle and choke
Performance
○
○
○
○
○
Carburetor
Float height
○
○
○
○
○
Carburetor
Adjustment
○
○
○
○
○
Engine
fuel
syst-
em
Fuel pipe
Changing
※
per 4 years
Summary of Contents for PA125
Page 10: ... 10 B CHASSIS Steel ball steering Front brake fluid Front brake cam ...
Page 12: ......
Page 33: ...33 1 Lubrication System Lubrication System Diagram ...
Page 42: ...42 42 2 Engine dismantling A Dismantling engine B lnstalling engine ...
Page 63: ... 63 7 A C Generator A Dismantling AC generator B Installing AC generator ...
Page 92: ... 92 F Rear damper 1 Rear damper disassembling diagram ...
Page 99: ... 99 3 Recharge system 1 Recharge system diagram ...
Page 103: ... 103 5 Starting system 1 Starting wiring ...