For the electricity-generating groups prearranged for automatic operation, in addition to carrying out all periodic
maintenance operations foreseen for normal usage, various operations must be carried out that are necessary in
relation to the specific type of use. The electricity-generating group in fact must be continuously prepared for operation,
even after prolonged periods of inactivity.
MAINTENANCE GENERATING SET WITH AUTOMATIC BOARD
l
Carry out motor oil change at least once a year, even if the requested number of hours has not been attained.
EVERY
WEEK
EVERY MONTH
AND/OR AFTER
INTERVENTION ON
LOAD
EVERY YEAR
1. TEST or AUTOMATIC TEST cycle to
keep the generating set constantly
operative
NO-LOAD
X
WITH LOAD
X
2. Check all levels: engine oil, fuel level,
battery electrolyte,, if necessary top
it up.
X
X
3. Control of electrical connections and
cleaning of control panel
X
X
ATTENTION
l
Maintenance operations on the electricity-generating group prearranged for automatic operation must be carried
out with the panel in RESET mode.
l
Maintenance operations on the installation’s electrical panels must be carried out in complete safety by cutting
off all external power sources: ELECTRICAL POWER, GROUP and BATTERY.
!