background image

The Specialist In Drum Handling Equipment

Model 400A-72SS-114

Stainless Steel Hydra-Lift, 72”, 

with Air Power Lift & Tilt

Operator’s Manual for Morse Stainelss Steel Hydra-Lift Karrier
Model 400A-72SS-114, Serial Number 0614 to ____ (MMYY)

morsedrum.com

Copyright 2022 - Morse Mfg. Co., Inc. 

 

Form OM400A-72SS-114 (0614-____)     (Updated 3 Mar., 2022)

 

5

CAUTION

 

– Do Not Transport with Drum Raised

ALWAYS LOWER THE DRUM HOLDER TO LOWEST POSITION BEFORE TRANSPORTING. 

  

The unit can become unstable when transporting with a raised load.

5.) Lift drum to desired pouring height.  Operate the tilt control as described in 

“Machine Description - Controls”

 to adjust 

the drum attitude. This is especially important when lifting an open drum.  The floor lock should be engaged while dis-

pensing / draining.

6.) When dispensing is complete, tilt drum back to upright position.  Disengage the floor lock and lower the drum to trans-

porting height; about 6” (15 cm) off the floor.

Operating Instructions

1.)  Push the Hydra-Lift Karrier to the drum.

2.)  Using the “LIFT” control as described in “

Machine 

Description - Controls

”, position drum holder with back 

band at middle of drum (Figure 3.1).  With ratchet plate 

swung open and cinch chain hanging from chain hook, 

push unit until back band rests firmly against drum.  

Some adjustment to tilt angle of saddle (drum holder) 

may be necessary to ensure band fits flush on drum.

3.) 

Attaching drum:

Drape chain across front of drum and engage chain link 

into notch in ratchet (Figure 3.2).  Turn ratchet clockwise 

to tighten chain.  If ratchet turns until pawl is beyond last 

ratchet tooth, turn ratchet back and slide next link into 

ratchet notch and try tightening again.  Chain must be 

held tightly against drum with pawl engaged securely in 

ratchet teeth.

4.) Operate lift function to lift drum clear of floor.  Roll to 

dispensing location.  NOTE: Do not allow drum to impact 

on floor, pouring station, etc. or spill or damage could 

occur.

START-UP Procedure

Machine is shipped with hydraulic fluid. 

1.  Install provided hydraulic control levers (threaded rods with black ball handles).

 

2.  IMPORTANT:

 BEFORE operation, remove the 

RED

 shipping plug from the hydraulic reservoir, and replace with the 

provided 

BLACK

 breather.

Figure 3.2

Summary of Contents for 400A-72SS-114

Page 1: ...for this purpose Open packages expeditiously to check the condition of the goods There is only a 24 hour window to notify the carrier of any concealed damage IMMEDIATELY REPORT ALL DAMAGE TO THE SHIPPING COMPANY Then you may contact Morse for assistance with your freight claim Morse Manufacturing will not be held responsible for any damaged freight that is not signed for as damaged Delivery to non...

Page 2: ...Floors Only For operation only on clean level floors of suitable bearing capacity Do not use on sloped surfaces ramps irregular or debris strewn floors WARNING Do Not Modify the Unit Under no circumstances should any modifications be made to the Morse machinery without factory au thorization Any modifications may void the warranty This machine was designed to perform a specific job and alterations...

Page 3: ...ter into the standard drum holder See Diameter Adapter info at https morsedrum com products diameter adapters ONLY Diameter Adapters for drum with 17 5 44 5 cm diameter or smaller have integrated brackets to prevent drum slipping length ways NOTE For 30 gallon 114 Liter PLASTIC drum insert Diameter Adapter AND install Bracket or Top Rim Clamp to prevent drum slipping IMPORTANT To prevent 30 to 55 ...

Page 4: ...l drum around it s middle using a cinch chain and ratchet tightening system It automatically adjusts for 22 to 23 5 56 to 59 7 cm diameter drum The MORCINCHTM Drum Holder also accepts accessories to handle a plastic drum fiber drum or a smaller diameter drum Figure 2 3 Controls The Morse Hydra Lift Karrier is manually propelled and steered The hydraulic pump is powered by a vane type air motor The...

Page 5: ...2 Using the LIFT control as described in Machine Description Controls position drum holder with back band at middle of drum Figure 3 1 With ratchet plate swung open and cinch chain hanging from chain hook push unit until back band rests firmly against drum Some adjustment to tilt angle of saddle drum holder may be necessary to ensure band fits flush on drum 3 Attaching drum Drape chain across fron...

Page 6: ... of the boom which contact the inside of the mast cap the hinge pin the gears and sprockets in the tilt drive and the ratchet and pawl Worn or damaged parts must be properly replaced with the correct genuine Morse parts Hydraulic pump is shipped filled with Noco Premium plus automatic transmission fluid d m Material safety data sheet msds is available online Change oil yearly sooner depending on d...

Reviews: