
Operation
16K PLUS
October 2019
5-19
Building Stacks
CAUTION: Return stacker to the “in-
line” position when moving between
bales in field and stack. This reduces
the chance of running over anybody
or anything in the field.
Starting Stacks
1. Choose a level area, with enough room to maneuver
a tractor and Bale Runner even after the stack is
finished.
Important: If completely level ground is not available,
then build your stack uphill (front of
tractor and Bale Runner facing uphill).
2. Begin stack by building a “backstop”. The proper
backstop should be built to withstand backing into the
stack every time a load is delivered. We recommend
the following back stop configurations:
1 Ton Squares:
A 2 bale by 2 bale square set at one
end, perpendicular to the length of the bales in the stack.
The first load in the stack should be only 7 bales.
1/2 Ton Squares:
A 3 bale by 3 bale square set at one
end, perpendicular to the length of the bales in the stack.
The first load in the rest of the stack should only be 2
bales by 4 bales, with one extra in the fifth tier.
3 X 4 Bales:
A 2 bale by 3 bale stack set at one end,
perpendicular to the length of the bales in the stack.
The first load in the stack should be 9 bales, and the
rest should be 12 bales.
1 Ton Backstop
1/2Ton Backstop
3X4 Backstop
Summary of Contents for PROAG 16K PLUS
Page 1: ...K49355 05 OPERATOR S MANUAL Auto Align Bale Runner Model 16K PLUS...
Page 28: ...Safety 1 22 October 2019 16K PLUS Notes...
Page 31: ...Specifications 16K PLUS October 2019 2 3 Bale Runner Dimensions...
Page 32: ...Specifications 2 4 October 2019 16K PLUS Notes...
Page 36: ...Checklist 3 4 October 2019 16K PLUS Notes...
Page 90: ...Operation 5 52 October 2019 16K PLUS Notes...
Page 104: ...Maintenance 6 14 October 2019 16K PLUS Electrical Diagrams...
Page 105: ...Maintenance 16K PLUS October 2019 6 15 Electrical Diagrams Continued...
Page 114: ...Storage 7 4 October 2019 16K PLUS Notes...
Page 138: ...9 2 October 2019 16K PLUS Frame...
Page 140: ...9 4 October 2019 16K PLUS Hitch...
Page 142: ...9 6 October 2019 16K PLUS Hydraulic Valves Mounting...
Page 144: ...9 8 October 2019 16K PLUS Sensors Mounting...
Page 146: ...9 10 October 2019 16K PLUS Bed Assembly Stage 1 Serial K161405191 and prior...
Page 148: ...9 12 October 2019 16K PLUS Bed Assembly Stage 1 Serial K161405301 to present...
Page 150: ...9 14 October 2019 16K PLUS Bed Assembly Stage 2...
Page 154: ...9 18 October 2019 16K PLUS Loader Assembly Serial K161405191 and prior...
Page 156: ...9 20 October 2019 16K PLUS Loader Assembly Serial K161405301 to present...
Page 158: ...9 22 October 2019 16K PLUS Loader Arm Assembly...
Page 162: ...9 26 October 2019 16K PLUS Drive Chain Assembly...
Page 164: ...9 28 October 2019 16K PLUS Final Assembly...
Page 166: ...9 30 October 2019 16K PLUS Hydraulic Assembly...
Page 167: ...16K PLUS October 2019 9 31 Hydraulic Assembly...
Page 170: ...9 34 October 2019 16K PLUS Hawe Valve...
Page 181: ...16K PLUS October 2019 9 45 Slack Adjustment Assembly...
Page 184: ...9 48 October 2019 16K PLUS Hydraulic Brake Assembly...
Page 186: ...9 50 October 2019 16K PLUS Notes...