
Operation
5-4
October 2019
16K PLUS
Machine Conventions
“Pushoff In”
The pushoff is retracted into the pushoff
tube.
“Pushoff Out”
The pushoff is extended from the
pushoff tube and penetrates through the hole in the
rear of the bed. The bed must be fully raised before the
pushoff tube can be extended, otherwise component
collision is possible.
“Power Slider Home”
The power slider is fully returned
underneath the loader.
“Power Slider Back”
The power slider has gone
through half of its cycle and is positioned on top of the
bed. This position varies along the bed depending on
the number of bales that have already been gathered.
“Alignment Arms Open”
The alignment arms are open
when the portion of the alignment arms that are closest
to the tractor are at their widest position.
“Alignment Arms Closed”
The alignment arms are
closed when the portion of the alignment arms that are
closest to the tractor are at their narrowest position.
“Grab Hooks In”
The grab hooks are in when they
are engaged, or grabbing the bale through the front of
the loader.
“Grab Hooks Out”
The grab hooks are out when
they are disengaged back behind the loader, or have
released the bale.
Summary of Contents for PROAG 16K PLUS
Page 1: ...K49355 05 OPERATOR S MANUAL Auto Align Bale Runner Model 16K PLUS...
Page 28: ...Safety 1 22 October 2019 16K PLUS Notes...
Page 31: ...Specifications 16K PLUS October 2019 2 3 Bale Runner Dimensions...
Page 32: ...Specifications 2 4 October 2019 16K PLUS Notes...
Page 36: ...Checklist 3 4 October 2019 16K PLUS Notes...
Page 90: ...Operation 5 52 October 2019 16K PLUS Notes...
Page 104: ...Maintenance 6 14 October 2019 16K PLUS Electrical Diagrams...
Page 105: ...Maintenance 16K PLUS October 2019 6 15 Electrical Diagrams Continued...
Page 114: ...Storage 7 4 October 2019 16K PLUS Notes...
Page 138: ...9 2 October 2019 16K PLUS Frame...
Page 140: ...9 4 October 2019 16K PLUS Hitch...
Page 142: ...9 6 October 2019 16K PLUS Hydraulic Valves Mounting...
Page 144: ...9 8 October 2019 16K PLUS Sensors Mounting...
Page 146: ...9 10 October 2019 16K PLUS Bed Assembly Stage 1 Serial K161405191 and prior...
Page 148: ...9 12 October 2019 16K PLUS Bed Assembly Stage 1 Serial K161405301 to present...
Page 150: ...9 14 October 2019 16K PLUS Bed Assembly Stage 2...
Page 154: ...9 18 October 2019 16K PLUS Loader Assembly Serial K161405191 and prior...
Page 156: ...9 20 October 2019 16K PLUS Loader Assembly Serial K161405301 to present...
Page 158: ...9 22 October 2019 16K PLUS Loader Arm Assembly...
Page 162: ...9 26 October 2019 16K PLUS Drive Chain Assembly...
Page 164: ...9 28 October 2019 16K PLUS Final Assembly...
Page 166: ...9 30 October 2019 16K PLUS Hydraulic Assembly...
Page 167: ...16K PLUS October 2019 9 31 Hydraulic Assembly...
Page 170: ...9 34 October 2019 16K PLUS Hawe Valve...
Page 181: ...16K PLUS October 2019 9 45 Slack Adjustment Assembly...
Page 184: ...9 48 October 2019 16K PLUS Hydraulic Brake Assembly...
Page 186: ...9 50 October 2019 16K PLUS Notes...