Installation Service User Manual
Maestro series
MB1000-MAN rev.1
14
o
If you must relocate the plumbing bracket due to site conditions watch that you have proper drainage
when the unit is in its lowest elevation position and that the unit flexible line connection allows for full
elevation of the unit.
CAUTION
Elevating units must retain the factory flexible line connection from the disposal to the P-Trap.
A hard connection will cause damage to the unit or the facility plumbing or both.
HOT and COLD water lines should be connected directly to the factory supplied water strainers. Especially in
new construction these strainers are your only protection from site debris damaging seals and valving in
your new workstation.
Water strainers supplied have a ½” NPT female thread. Plan final connections to HOT and COLD water lines
accordingly. Be sure to use a backup wrench on the strainer when tightening the connections.
3.1.8
Ventilation connection
(in-house ventilation)
At this point the unit should still be in its lowest elevation position, if not, please lower to the lowest
position in order to properly size the flexible ducts to the facility connection.
Locate the (2) 8” diameter flexible vent ducts and (4) hose clamps shipped with the unit. These are typically
shipped in the knee space on the skid. Otherwise check in the sink.
Slide the vent duct and clamp over the duct stubs on the top of the unit.
Connect the opposing end to the facility vent stubs. With the unit still in its lowest elevation the excess
flexible duct may be trimmed to fit. This will optimize flow performance throughout the elevation range by
reducing the chance for any bunching or kinking due to excess material.
Tighten all hose clamps on the ducts.
3.1.9
Recirculating Ventilation
(if equipped)
No external ductwork is connected if the unit is equipped with recirculating ventilation unit.
Recirculation filters are loaded into the top of the unit. Check that all packaging and wrap is removed from
filters before use.
Summary of Contents for Maestro MB1000 Series
Page 52: ...Installation Service User Manual Maestro series MB1000 MAN rev 1 52 9 2 Electrical diagrams...
Page 53: ...Installation Service User Manual Maestro series MB1000 MAN rev 1 53...
Page 54: ...Installation Service User Manual Maestro series MB1000 MAN rev 1 54...
Page 55: ...Installation Service User Manual Maestro series MB1000 MAN rev 1 55 9 3 Plumbing diagrams...
Page 56: ...Installation Service User Manual Maestro series MB1000 MAN rev 1 56...