
Document No: DELTA SIGMA-USM
Version 4
Revision 3.94.2
Page: 8 / 32
2.4
MEASUREMENT PROCESS
The DS will automatically continue the previously run project. If there are no projects stored
in the DS, the screen will show "No projects" before going to the Project List screen as shown
on page 8.
BOLT INFORMATION SCREEN
If this is your current project, press the
MEASURE
button.
To select a different project or start a new project, press the Selected Project button. You now
enter the Project List Screen
PROJECT LIST SCREEN
Here all previous projects will be listed. If there are no projects stored in the DS, the page will
be empty like shown on the picture above, except for the "Operation Subsea" button. Select
the project you are working on or to start a new project by pressing the
NEW
button. You will
then enter the Project Data Screen as shown on the next page.
View or change
project info
View or change
Displayed Bolt Data info
View or change
Project Data
Measure Selcted Bolt
Selected Project:
Select New Project
Selected Bolt:
Select New Bolt
Selected Bolt Type:
Select New Bolt
Return to previous Screen
Scroll up through
displayed Projects
Enter new project
Scroll down
Previously stored project