![Molift Quick Raiser 2+ Technical Manual Download Page 7](http://html1.mh-extra.com/html/molift/quick-raiser-2/quick-raiser-2_technical-manual_1824218007.webp)
Page 7 of 24
Equipment and special tools
Equipment
See the Operator Manual for accessories and
equipment relating to the daily use of the lifter.
Special tools
No special tools are required.
Replacement of parts
The replacement of parts must only be carried
out by authorised dealers!
Lifting motor, removing
You will need:
• Hex key 5mm
Procedure:
• Remove the lifting column
• Remove the motor housings
B
8
and
B
20
(ABS
housings)
• Unscrew the three hexagonal screws
B
19
at the
foot of the column which attach the motor to
the chassis
• Disconnect the electric cables from the motor
• Pull the motor downwards then out from the
chassis
Lifting motor, fitting
You will need:
• Hex key 5mm
• Loctite 243
Procedure:
• Follow the above procedure in the reverse
sequence. Put Loctite 243 on the motor’s three
mounting screws before assembling, but only
screw them in slightly. Check that the three
rubber washers for these three screws are pro-
perly seated. Before fixing the motor in place,
it should be centred in relation to the lifting
column place the column in its correct position
on the chassis to check this.
• Engage the lifting column and operate the
motor until the runner-block on the ball screw
comes all the way down and the motor stops.
Only then should you tighten up the motor’s
mounting screws.
• The newly-fitted motor should be labelled with
the date of fitting and the fitter’s signature.
• Replace the side housings.