![Molift Quick Raiser 2+ Technical Manual Download Page 17](http://html1.mh-extra.com/html/molift/quick-raiser-2/quick-raiser-2_technical-manual_1824218017.webp)
Page 17 of 24
Lifting column
Bill of materials:
1
Material.
Comment.
Dimension/
Draw. no.
Description.
Qty.
Pos.
08-174 BOM.xls
184
1210
3
5
7
1
4
6
6
6
6
27
8
5
13
11
12
10
10
16
Assembly instructions / labeling = 08-P04
Note! all labeling to be done according to instruction 08-P04
26
14
24
23
21
22
20
22
21
25
29
28
17
15
Note!
Solder cables from battery baox according to
assembly instructions 08-P04
(Red to + and black to - marked in the plastic)
31
30
*
32
B
C
D
33
45
235
*
= Add LOCTITE 2701
D
Lagt til pos 33 EO60/10
15.06.2010 TÅB
MHL
C
Made separate assy of top plate
11.05.2009 TÅB
MHL
B
Added label pos 32
23.03.2009 TÅB
MHL
A
Released for production
17.12.2008 TÅB
MHL
Rev.
Description:
Date/Sign.
Approved:
32
1
End stopper
08-209
30
1
08-186
29
1
Distance slewe
08-181
28
1
DIN 912 M5 x 20 ---
20N
27
1
Unbrake 8 mm
0210124
26
1
Unbrako 4 mm
0220127
25
1
Tapping screw DIN
7983-ST2.9x6.5-C-H-
N
24
2
0210307 Nødsenkning
Partner - QR
23
1
Hand wheel ø50
M10
0235102
22
1
Bolt M10
0235107
21
2
Rubber
BUNPRON
SJ5027 Grey
0410306
20
2
DIN 912 M10 x 16 ---
16N
19
1
02-215
18
1
Art. and id no.
13-217
17
1
Art. and id no.
13-216
16
1
Arrow column
depth label
13-221
15
1
Label scale 1-30 08-110
14
1
Label quick raiser 08-109
13
1
Emergency
lowering
13-222
12
1
Slinglabel
13-223
11
1
Red label left
08-108
10
1
Red label right
08-107
9
1
ISO 7046-1 - M3 x 8 -
Z --- 8N
8
1
Conection point
column
08-095
7
1
Battery holder and
electronics
08-092
6
4
Tapping screw DIN
7983-ST5.5x16-C-H-N
5
2
0411104 Column brush
type 7 - 0,10 nylon LG
1200
4
1
02-402
3
1
02-168
2
1
Top cover assy
08-196
31
1
Ball screw assy
QR2+ 2008
08-173
Pos.
Qty.
Description
Dimension/
Draw. no.
Material:
Comment:
Molift Quick Raiser
Drawing name:
17/12-2008
Drawing number:
Coloumn assy QR2+ 2008
A2
08-174
1:5
TÅB
Projection:
Scale:
Date:
Designed/Drawn:
Size
Appendix B
Geometrical tolerancing: ISO 1101
08-046 BOM.xls
Bill of materials:
1
Material.
Comment.
Dimension/
Draw. no.
Description.
Qty.
Pos.
1
3
2
Fit with Wurth SKG Gel glue.
Wash parts with a cleaner. (Unirens or equal)
Parts to be dry and dust free before gluing. Add gel all
over the "tube" on the plastic part.
Drying time = 12 hours
B
4
5
Note!
Radius on this end.
C
D
7
6
To be put in a bubble bag and closed
Check that arm fits to trolley.
Use a trolley and check that if fits to bolts.
3 A
3 A
A
5 (2x)
10
Pull back rubber handle, drill hole ø5
trough. Assemble pin ø5 and roll back
rubber handle. (Both sides)
Note! Use support when drilling.
D
C
C
D
Added pos 7 spirol Eo 22710
08.02.2010TÅB
MHL
C
Added dry time and text
01.09.2009 TÅB
MHL
B
Changed glue, added pos 4,5 and 6 28.05.2009 TÅB
MHL
A
Released for production.
25.10.2004 ORH
MH Lie
Rev.
Description:
Date/Sign.
Approved:
Pos.
Qty.
Description
Dimension/
Draw. no.
Material:
Comment:
1
1
Lifting arm
08-044
2
2
Hand grip
08-049
3
2
Rope Clamp
08-032
Size
Designed/Drawn: Date:
Scale:
Projection:
ORH
1:5
08-046
A3
200 kg Lifting arm
Drawing number:
16/10-2004
Drawing name:
Assembly drawing
Molift QR II
Bill of materials:
1
Material.
Comment.
Dimension/
Draw. no.
Description.
Qty.
Pos.
08-172 BOM.xls
167
565
1
3
4
2
2
Gluded with
BOSTIK 3665
Glued with
BOSTIK 3665
Assembly instructions = 08-P13
A
Released for production
28.09.2007 TÅB
MHL
Rev.
Description:
Date/Sign.
Approved:
4
1
Bolt M10
0235107
3
1
Hand wheel ø50
M10
0235102
2
2
Grip handle
458101
1
1
02-133
Pos.
Qty.
Description
Dimension/
Draw. no.
Material:
Comment:
Size
Designed/Drawn: Date:
Scale:
Projection:
TÅB
1:5
08-172
A3
Handle complete
Drawing number:
29/09-2007
Drawing name:
Molift Quick Raiser 2008
33
Handle QR/QR2/QR2+