Installation
1
2
4
3
5
Interior adjustment block: Screw in the threaded bolts
Interior adjustment block: Height adjustment
Levelling
Outer adjustment block: Latch into the trough profile
Outer adjustment block: Fix with screws
2
3
1
4
5
Installation Preparation
To prevent the movement or warping of the ESK during the use of
wet or hot screed, we recommend that the unit be anchored in at
least 4 points to the unfinished floor with Adjustment Blocks!
Protection Cover
Remove the protective cover permanently only after finishing the installati-
on of the system convector and after finishing all building work. By this you
avoid contamination and damage to the system convector.
The electric connection side is marked „
•
“ on the protective cover.