Terminating resistors
The first and last slaves of a PROFIBUS-DP fieldbus segment
must be terminated with a switched on terminating resistor.
The bus termination resistors are connected externally. The
external connection can be implemented either with a
separate terminating resistor or by a special SUB D
connector.
The PROFIBUS-DP data plug from Moeller allows switching
on and off both termination resistors.
EMC-conformant wiring of
the network
Undesired faults can occur on the fieldbus due to
electromagnetic interference. They can be minimised
beforehanc by the implementation of suitable EMC
measures. These include:
• EMC-conformant system configuration,
• EMC compliant cable installation and
• measures which do not allow potential differences to
occur,
• correct installation of the PROFIBUS system (cables,
connection of the bus connectors,…).
The electromagnetic interference can be significantly
reduced by the use of a cable screen (shield). The following
illustration indicates the correct method for connection of
the shield.
Summary of Contents for SmartWire SWIRE-GW-DP
Page 12: ...8 11 06 AWB1251 1590GB...
Page 22: ...18 11 06 AWB1251 1590GB...
Page 26: ...22 11 06 AWB1251 1590GB...
Page 38: ...34 11 06 AWB1251 1590GB...
Page 45: ...Dimensions 41 11 06 AWB1251 1590GB Dimensions M4 7 5 35 5 7 5 90 102 110 105 109 4 5...
Page 46: ...42 11 06 AWB1251 1590GB...