• Select the required sensor settings (see below)
• Switch on and check for correct operation ensuring the green indicator LED is illuminated
• See below for operation of the self-test function
• We recommend, on commissioning the installation, a minimum charge period of 24 hours before carrying
out an emergency duration test
Fig. 3
Fig. 3
•
Select the required sensor settings (see below)
•
Switch on and check for correct operation
Fig. 3
•
Select the required sensor settings (see below)
•
Switch on and check for correct operation ensuring the green indicator LED is illuminated
•
See below for operation of the self-test function
•
We recommend, on commissioning the installation, a minimum charge period of 24 hours before
carrying out an emergency duration test