OPERATING INSTRUCTIONS
| 15
WARNING!
The hammer and suspension must be kept in alignment with each other, and with the pile,
when driving or extracting. Failing to do so will result in damage to the jaws and clamp
cylinders.
4” 2” 2” 4”
NO OK OK NO
Hammer, suspension and pile inline
Out of alignment
If the jaws slip on the pile STOP DRIVING AND IDENTIFY THE PROBLEM.