![MK ZRF-P 2010 Technical Documentation Manual Download Page 24](http://html1.mh-extra.com/html/mk/zrf-p-2010/zrf-p-2010_technical-documentation-manual_1813005024.webp)
Technical Documentation
ZRF-P 2010
mk North America, Inc.
|
105-125 Highland Park Drive
|
Bloomfield, CT 06002
|
860.769.5500
|
www.mknorthamerica.com
©2017
|
Page 24
8
CONVEYOR BELT MAINTENANCE - BELT REPLACEMENT
8.1 Standard Idler
25
General Remarks:
• Prior to replacing the belt, the tail assembly must be completely loosened and retracted – instructions
for this to follow.
• Any interfering parts must be removed – instructions on this to follow.
• Any auxiliary parts that interfere must be removed. This includes supports pieces.
• One side of the conveyor must be free and clear of all interferences. This MUST be the side with the
black cover strip.
• Reassemble in reverse order.
• Replacement belts must be tracked and tensioned prior to use. (see Section 7)
All work to be performed by qualified personnel only.
Conveyor power must be disconnected before replacing the belt.