![MK ZRF-P 2010 Technical Documentation Manual Download Page 19](http://html1.mh-extra.com/html/mk/zrf-p-2010/zrf-p-2010_technical-documentation-manual_1813005019.webp)
mk North America, Inc.
|
105-125 Highland Park Drive
|
Bloomfi eld, CT 06002
|
860.769.5500
|
www.mknorthamerica.com
©2017
|
Page 19
6
WEAR ITEMS & MAINTENANCE FOR SPECIFIC DRIVE OPTIONS (CONT.)
6.4
ZRF-P 2010 AS (Cont.)
Maintenance Work for ZRF-P 2010 AS
* LEGEND:
I
nspect,
R
eplace,
T
ension,
C
lean,
L
ubricate (grease).
Position Description
Action
*
Interval in Hours (Months)
Lubrication
1
Roller Bearing
I
1,000 Hours (Max. 6 Months)
2
Drive/Idler Sprocket
I, C
500 Hours (Max. 3 Months)
3
Wear Strip
I, C
500 Hours (Max. 3 Months)
R
If wear visible
4
Timing Belt
I, C
500 Hours (Max. 3 Months)
R
If wear visible
5
Gearmotor
I, C
Service & maintenance per
manufacturer’s documentation
6 & 7
Drive Train Sprockets I, C
500 Hours (Max. 3 Months)
SAE20-SAE50
8
Drive Train Chain
I, C, T, L
500 Hours (Max. 3 Months)
SAE20-SAE50
R
If chain stretch is greater than 3%
Position Description
Part Number
1
Roller Bearing 6006-2RS1
K101000428
2
Drive/Idler Sprocket
58.01.0024
3
Wear Strip
Inquire with mk North America
4
Belt
Inquire with mk North America
5
Gearmotor
Inquire with mk North America
6
Sprocket at Drive Roll
Inquire with mk North America
7
Sprocket at Gearmotor
Inquire with mk North America
8
Chain & Connecting Link
Inquire with mk North America
NOTE: For adjusting the chain tensioning, please see the related section for details. When cleaning the chain,
avoid any harsh chemicals or detergents.