BX-4
33
OPERATION:
Pump, tubes, fittings & nozzles are pre-installed & inspected
at factory. Set-up cutting with dust suppression system
is accomplished by filling up Water Tank, Closing Cap, &
pushing Tube into Push-to-Connect Coupling (6).
Step A:
Fill up water tank with fresh clean water. Push
3/8” x 1/4” tube (1) thru grommet & into a 1/2” x 3/8” x
1-1/2” tube (2). Push (2) into a plastic filter.
Step B:
Drop filter into the water tank. Ensure the filter is
sitting on the bottom of the tank.
Step C:
Screw cap (5) onto the water tank.
Step D:
Push other end of tube into push-to-connect
coupling (6).
NOTE:
A full tank of water will last about 2-1/2 hours at
continous operation.
Step E:
Push pump switch (7) to “ON” position.
NOTE:
I - ON , O - OFF
Step F:
Depress trigger switch to start motor & misting
pump. Mist should be seen within 5 seconds.
MISTING SYSTEM OPERATION, MAINTENANCE & TROUBLESHOOTING
Do Not Run Pump Dry.
Pump damage may result if adequate water flow is not
present.
CAUTION
4
3
2 1
5
6
7