65
OPERATING PROCEDURE
PHOTOS
Photo 8
Welded parts of 4-way valve
6. Removing the compressor and 4-way valve
(1) Remove the top panel, cabinet and service panel.
(Refer to 1.)
(2) Remove the back panel. (Refer to 1.)
(3) Remove the inverter assembly. (Refer to 2.)
(4) Recover gas from the refrigerant circuit.
NOTE:
Recover gas from the pipes until the pressure
gauge shows 0 PSIG.
(5) Detach the welded part of the suction and the discharge
pipe connected with compressor. (Photo 9)
(6) Remove the compressor nuts.
(7) Remove the compressor.
(8) Detach the welded part of 4-way valve and pipe. (Photo 8)
7. Removing the reactor
(1) Remove the top panel. (Refer to 1.)
(2) Disconnect the reactor lead wire.
(3) Remove the screws of the reactor, and remove the reactor.
Photo 10
Screws of the reactor
Photo 9
Welded part of the
discharge pipe
Welded part of the
suction pipe
R.V. coil
(for MUZ)
OB451--3.qxp 06.3.29 9:47 AM Page 65
Summary of Contents for MUY-A15NA
Page 11: ...11 WIRING DIAGRAM 5 MUZ A09NA MUZ A12NA MUZ A15NA MUZ A17NA...
Page 12: ...12 MUY A15NA MUY A17NA...
Page 13: ...13 MUZ A24NA...
Page 14: ...14 MUY A24NA...