3 Controller
TB extension cable
3-76
■ Installation/ connection specification
1) Installation specification (operation panel of customer preparation)
Fig.3-33 : Installation of TB extension
2) Connection procedure
Connect the male side connector of TB extension cable to TB connection connector of the drive unit.
Connect T/B to the scalpel side connector fixed to the operation panel etc of customer preparation.
Pasting the indication seal
Notes) The board thickness which can
be installed is 0.5mm to 2.3mm.
Installation of TB extension cable
Fix the scalpel side connector to the operation panel etc of customer preparation.
4-M3 screws
Connector installation hole size
Indication seal
(accessories)
Indication seal
Installation
hole
Turn the triangle mark
to upward.
TB extension cable socket
Operation panel surface
Case
4-M3 x 8 screw
Square
hole
Summary of Contents for MELFA SQ Series
Page 2: ......
Page 110: ......
Page 111: ......
Page 112: ......
Page 113: ......
Page 114: ......
Page 115: ......
Page 116: ......
Page 117: ......
Page 118: ......
Page 119: ......
Page 120: ......
Page 121: ......
Page 122: ......
Page 123: ......
Page 124: ......
Page 125: ......
Page 126: ......
Page 127: ......
Page 128: ......
Page 129: ......
Page 130: ......
Page 131: ......
Page 132: ......
Page 133: ......
Page 134: ......
Page 135: ......
Page 136: ......
Page 137: ......