
-
75
-
'14 • SR-T-157
10. MAINTENANCE DATA
10.1 SRR series
'09•SRK-DB-087D
(1) Cautions
(2) Items to check before troubleshooting
(3) Troubleshooting procedure (If the air conditioner does not run at all)
Important
YES
YES
YES
NO
NO
NO
NO
YES
(a) If you are disassembling and checking an air conditioner, be sure to turn off the power before beinning. When
working on indoor units, let the unit sit for about 1 minute after turning off the power before you begin work.
When working on an outdoor unit, there may be an electrical charge applied to the main circuit (electrolytic
condenser), so begin work only after discharging this electrical charge (to DC 10 V or lower)
(b) When taking out printed circuit boards, be sure to do so without exerting force on the circuit boards or package
components.
(c) When disconnecting and connecting connectors, take hold of the connector housing and do not pull on the lead wires.
'09•SRK-DB-087D
(1) Cautions
(2) Items to check before troubleshooting
(3) Troubleshooting procedure (If the air conditioner does not run at all)
Important
YES
YES
YES
NO
NO
NO
NO
YES