
ISTZ220019A
30
[For air conditioner]
Follow step (3-2) to log in to the gateway setting screen. Start this procedure when two or more minutes
have elapsed after setting the gateway in step (3-3). The connection may fail because the gateway is
being rebooted.
After login, click [CGW Status] from the menu on the left side of the screen. By referring to the displayed
details, check the connection status on the superlink side (SuperLink Status).
According to SuperLink Status, execute the following:
[OK]
: Confirm whether the Superlink signal line is securely connected to the indoor unit
for which the [×] icon is displayed on the M-ACCESS screen.
[NG]
: Confirm whether the Superlink signal line is securely connected to the gateway.
[--]
: Confirm that the gateway is connected to the network and that the activation is completed,
then reboot the gateway.
Summary of Contents for RM-CGW-E1
Page 11: ...ISTZ220019A 11 ...
Page 21: ...ISTZ220019A 21 ...
Page 22: ...ISTZ220019A 22 For PAC connected via interface ...
Page 23: ...ISTZ220019A 23 ...
Page 24: ...ISTZ220019A 24 For heat source unit ...
Page 26: ...ISTZ220019A 26 ...
Page 28: ...ISTZ220019A 28 ...
Page 36: ...ISTZ220019A 36 This completes the installation procedure ...
Page 38: ...ISTZ220019A 38 ...
Page 51: ...ISTZ220019A 51 This completes the installation procedure ...