B-71
INST
ALLA
TION PROCEDURE
CEILING-CONCEALED
S series
CEILING-
CONCEALED
S3
S2
S1
S3
S2
S1
CN90
Indoor unit
Outdoor unit
Signal receiving unit
Wireless remote controller
Main switch/fuse
Grounding
[Fig. 8-1]
[Fig. 8-2-1]
S3
S3
S2
S1
S2
S1
For Power supply
For Power
supply
Use PG bushing to keep the weight of the cable and external force from being
applied to the power supply terminal connector. Use a cable tie to secure the cable.
Power source wiring
Tensile force
Use ordinary bushing
Signal receiving unit wiring
Terminal bed for power source and indoor transmission
To 1-phase power source
Connecting the signal receiving unit
Connect the signal receiving unit to the CN90 (Connect to the wireless remote
controller board) on the indoor unit using the supplied remote controller wire. Con-
nect the signal receiving units to all the indoor units.
Terminal bed box
Knockout hole
Remove
Screw holding cover (2pcs)
Cover
[Fig. 8-2-3]
[Fig. 8-2-4]
[Fig. 8-2-2]
[Fig. 7-1]
Air inlet
Air outlet
Access door
Ceiling surface
Canvas duct
Air filter
Inlet grille
7
8.2
8
8.1