OPERATING PROCEDURE
PHOTOS/FIGURES
8. Removing LEV coil
[LEV-A]
(1) Remove the service panel. (See Photo 1)
(2) Disconnect the connector CNL VA (WH) on the multi
controller circuit board in the electrical parts box.
(3)
Remove the LEV coil by sliding the coil upward. (See Photo 13)
[LEV-B]
(1) Remove the service panel. (See Photo 1)
(2) Disconnect the connector CNL VB (RD) on the multi
controller circuit board in the electrical parts box.
(3)
Remove the LEV coil by sliding the coil upward. (See Photo 13)
Photo 12
Photo 13
Photo 14
9. Removing LEV
(1) Remove the service panel. (See Photo 1)
(2) Remove the top panel. (See Photo 1)
(3) Remove the electrical parts box. (Refer to procedure 3)
(4) Remove the LEV coil.(Refer to procedure 8)
(5) Recover refrigerant.
(6) Remove the welded part of LEV.
Note 1: Recover refrigerant without spreading it in the air.
Note 2: The welded part can be removed easily by
removing the right side panel.
Note 3: When installing the LEV, cover it with a wet cloth
to prevent it from heating (120°C or more), then
braze the pipes so that the inside of pipes are
not oxidized.
Thermistor <Ambient> (TH7)
Sensor holder
Thermistor
<Suction> (TH6)
Thermistor
<HIC> (TH2)
Thermistor
<Compressor>
(TH4)
LEV coil
(LEV-B)
Thermistor
<Liquid> (TH3)
LEV coil
(LEV-A)
138
OCH668G