89
OPERATING PROCEDURE
PHOTOS
5. Removing the control P.C. board, the reactor and
the power board
(1) Remove the top panel and the service panel (Photo 1).
(2) Disconnect the connectors on the control P.C. board.
Remove the screws of the control P.C. board, and
remove the control P.C. board.
(3) Remove the screws of the reactor cover, and remove the
reactor cover.
(4) Remove the screws of the reactor, and remove the reactor.
(5) Remove the screws of the power board, and remove the
power board.
Photo 9
Screws of the
control P.C. board
Screws of the reactor cover
Photo 10
Photo 11
Screws of the power
board
Screws of the reactor
Summary of Contents for MXZ-3C54VA
Page 16: ...16 WIRING DIAGRAM 6 MXZ 3C54VA ...
Page 17: ...17 MXZ 3C68VA ...
Page 18: ...18 MXZ 4C71VA ...
Page 19: ...19 MXZ 4C80VA ...
Page 20: ...20 MXZ 5C100VA ...
Page 21: ...21 MXZ 6C120VA ...