4-1. PURGING PROCEDURES AND LEAK TEST

3-2. PIPE CONNECTION

1) Apply a thin coat of refrigeration oil (G) to the flared ends of the pipes and the pipe connections of the outdoor 

unit.

2) Align the center of the pipe with that of the pipe connections of the outdoor unit, then hand tighten the flare 

nut 3 to 4 turns.

3) Tighten the flare nut with a torque wrench as specified in the table.

• Over-tightening may cause damage to the flare nut, resulting in refrigerant leakage.

• Be sure to wrap insulation around the piping. Direct contact with the bare piping may result in burns or frostbite.

3-3. INSULATION AND TAPING

1) Cover piping joints with pipe cover.

2) For outdoor unit side, surely insulate every piping including valves.

3) Using piping tape (E), apply taping starting from the entry of outdoor unit.

•  Stop the end of piping tape (E) with tape (with adhesive agent attached).

•  When piping have to be arranged through above ceiling, closet or where the temperature and humidity are 

high, wind additional commercially sold insulation to prevent condensation.

1) Remove service port cap of stop valve on the side of the outdoor unit 

gas pipe. (The stop valves are fully closed and covered in caps in 

their initial state.)

2) Connect gauge manifold valve and vacuum pump to service port of 

stop valve on the gas pipe side of the outdoor unit.

3) Run the vacuum pump. (Vacuumize for more than 15 minutes.)

4) Check the vacuum with gauge manifold valve, then close gauge 

manifold valve, and stop the vacuum pump.

5) Leave as it is for one or two minutes. Make sure the pointer of gauge 

manifold valve remains in the same position. Confirm that pressure 

gauge shows -0.101 MPa [Gauge] (-760 mmHg).

6) Remove gauge manifold valve quickly from service port of stop valve.

7) Fully open all stop valves on the gas pipe and the liquid pipe. Operating 

without fully opening lowers the performance and this causes trouble.

8) Refer to 1-2., and charge the prescribed amount of refrigerant if 

needed. Be sure to charge slowly with liquid refrigerant. Otherwise, 

composition of the refrigerant in the system may be changed and 

affect performance of the air conditioner.

9) Tighten cap of service port to obtain the initial status.

10) Leak  test

 

WARNING

When installing the unit, securely 

connect the refrigerant pipes before 

starting the compressor.

 

CAUTION

When there are the ports which are 

not used, make sure their nuts are 

tightened securely.

Stop valve 

for GAS

Stop valve 

cap (Torque 

19.6 to 29.4 

N•m, 200 to 

300 kgf•cm)

Gauge manifold 

valve (for R410A)

Compound pressure 

gauge (for R410A)

–0.101 MPa  

(–760 mmHg)

Handle 

Low

Handle High

Vacuum pump

(for R410A)

*Close

*Open

Hexagonal wrench

*4 to 5 turns

Stop valve 

for LIQUID

Pressure gauge

(for R410A)

Precautions when using 

the control valve

When attaching the control valve 

to the service port, valve core may 

deform or loosen if excess pres-

sure is applied. This may cause 

gas leak.

Service 

port

Charge hose 

(for R410A)

Body

Close

Open

Control 

valve

A

When attaching the control valve to 

the service port, make sure that the 

valve core is in closed position, and 

then tighten part A. Do not tighten 

part A or turn the body when valve 

core is in open position.

Service port cap

(Torque 13.7 to 17.7 

N•m, 

140 to 180 kgf

cm)

Charge hose 

(for R410A)

4-2. GAS CHARGE

Perform gas charge to unit.

1) Connect gas cylinder to the service port of stop valve.

2) Perform air purge of the pipe (or hose) coming from refrigerant gas cylinder.

3) Replenish specified amount of the refrigerant, while operating the air conditioner 

for cooling.

Note:

In case of adding refrigerant, comply with the quantity specified for the refrigerat

-

ing cycle.

CAUTION:

When charging the refrigerant system with additional refrigerant, be sure to use 

liquid refrigerant. Adding gas refrigerant may change the composition of the refriger-

ant in the system and affect normal operation of the air conditioner. Also, charge 

the liquid refrigerant slowly, otherwise the compressor will be locked.

To maintain the high pressure of the gas cylinder, warm the gas cylinder with 

warm water (under 40°C) during cold season. But never use naked fire or steam.

Refrigerant  gas            

cylinder  

operating valve

(for R410A)

Indoor 

unit

Charge hose (for R410A)

Refrigerant gas cylinder 

for R410A with siphon

Electronic scale for 

refrigerant charging

Refrigerant (liquid)

Indoor 

unit

Union

Union

Liquid pipe

Gas pipe

Liquid pipe

Gas pipe

Stop valve

Service port

Outdoor 

unit

Gauge manifold 

valve (for R410A)

4.  PURGING PROCEDURES, LEAK TEST, AND TEST RUN

JG79A379H03_en.indd   4

2016/03/02   9:49:08

Summary of Contents for MXZ-2C30VA

Page 1: ...relativo manuale di instal lazione Εγχειρίδιο εγκατάστασης Για τον ΤΕΧΝΙΚΟ Στο παρόν εγχειρίδιο περιγράφεται μόνο η εγκατάσταση της μονάδας εξωτερικού χώρου Για την εγκατάσταση της μονάδας εσωτερικού χώρου ανατρέξτε στο εγχειρίδιο εγκατάστασης της μονάδας εσωτερικού χώρου Manual de Instalação Para o INSTALADOR Este manual descreve apenas a instalação da unidade exterior Quando proceder à instalaçã...

Page 2: ...installation has been completed If refrigerant gas leaks indoors and comes into contact with the flame of a fan heater space heater stove etc harmful substances will be generated n Use appropriate tools and piping materials for installation The pressure of R410A is 1 6 times more than R22 Not using appropriate tools or materials and incomplete installation could cause the pipes to burst or injury ...

Page 3: ...baffle board on the air outlet side of the outdoor unit Avoid the following places for installation where air conditioner trouble is liable to occur Where flammable gas could leak Where there is much machine oil Salty places such as the seaside Where sulfide gas is generated such as a hot spring Where there is high frequency or wireless equipment Where there is emission of high levels of VOCs incl...

Page 4: ...onnecting wire B and power supply cord A with the cable clamps 7 Close the service panel securely Make sure that 3 2 PIPE CONNEC TION is completed After making connections between both power supply cord A and indoor outdoor unit connecting wire B be sure to fix both cable and wire with cable clamps Indoor outdoor unit connecting wire OUTDOOR UNIT 35 mm 15 mm Lead wire Terminal block UNIT UNIT Term...

Page 5: ... cap of service port to obtain the initial status 10 Leak test WARNING When installing the unit securely connect the refrigerant pipes before starting the compressor CAUTION When there are the ports which are not used make sure their nuts are tightened securely Stop valve for GAS Stop valve cap Torque 19 6 to 29 4 N m 200 to 300 kgf cm Gauge manifold valve for R410A Compound pressure gauge for R41...

Page 6: ...nnecting wires cannot be detected Thus be sure to perform the test run one by one Make sure that the following is done Power is supplied to the unit Stop valves are open About the restart protective mechanism Once the compressor stops the restart preventive device operates so the compressor will not operate for 3 minutes to protect the air conditioner 5 1 PUMPING DOWN When relocating or disposing ...

Page 7: ...инить при работающем компрессоре и откры том стопорном клапане возможно засасывание воздуха и чрезмерное повыше ние давления в контуре охлаждения Это может привести к разрыву труб или нанесению увечий n При установке прибора надежно подсоедините трубы с хладагентом до запуска компрессора Если компрессор запускается до подсоединения труб с хладагентом и при от крытом стопорном клапане возможно заса...

Page 8: ...ентой 7 8 раз Для использования имеющегося трубопровода выполните опе рацию COOL ОХЛАЖДЕНИЕ в течение 30 минут и осуществите откачку перед демонтажем старо го кондиционера Повторно смон тируйте раструб в соответствии с размером для нового количества хладагента Воздухозаборное отверстие Примечание При эксплуатации кондиционера при низкой температуре наружно го воздуха обязательно следуйте приведенн...

Page 9: ...да со единения внутреннего наружного приборов В убедитесь что и провод и шнур закреплены с помощью проводных зажимов Клеммная колодка для электропитания Сервисная панель 35 мм 15 мм Провод соединения внутреннего наружного приборов НАРУЖНЫЙ ПРИБОР ЭЛЕКТРОПИТАНИЕ N 230 В 50 Гц Силовой провод ПРИБОР Клеммная колодка для электропитания Обязательно присоедините каждый винт к соответствующей клемме при ...

Page 10: ...ном случае состав хладагента в системе может измениться что отрицательно повлияет на производительность кондиционера 9 Затяните колпачок сервисного порта для возврата к исходному состоянию 10 Проверка на отсутствие утечек 4 1 ПРОЦЕДУРЫ ПРОДУВКИ И ПРОВЕРКА НА ОТСУТСТВИЕ УТЕЧЕК Если некоторые порты не исполь зуются убедитесь что их гайки надежно затянуты Стопорный клапан для ГАЗА Колпачок стопор ног...

Page 11: ... следует выполнять поэтапно Убедитесь что выполнено следующее На прибор подается питание Запорные клапаны открыты О защитном механизме повторного запуска После остановки компрессора включается защитное устройство повторного запуска отключающее компрессор на несколько минут для защиты кондиционера 4 6 ПОЯСНЕНИЕ ДЛЯ ПОЛЬЗОВАТЕЛЯ Используя ИНСТРУКЦИИ ПО ЭКСПЛУАТАЦИИ объясните пользователю как эксплуа...

Page 12: ...HEAD OFFICE TOKYO BUILDING 2 7 3 MARUNOUCHI CHIYODA KU TOKYO 100 8310 JAPAN JG79A379H03 ...

Reviews: