OPERATING PROCEDURE
PHOTOS/FIGURES
5. Removing outdoor fan motor
(1) Remove the top panel, cabinet and service panel. (Refer to
section 1.)
(2) Disconnect the following connectors:
<Inverter P.C. board>
CN931, CN932 (Fan motor)
(3) Remove the propeller fan nut.
(4) Remove the propeller fan.
(5) Remove the screws fixing the fan motor.
(6) Remove the fan motor.
Photo 7
Photo 8
6. Removing the compressor and 4-way valve
(1) Remove the top panel, cabinet and service panel. (Refer to
section 1.)
(2) Remove the back panel. (Refer to section 1.)
(3) Remove the screws fixing the relay panel.
(4) Remove the relay panel.
(5) Remove the inverter assembly. (Refer to section 2.)
(6) Recover gas from the refrigerant circuit.
NOTE:
Recover gas from the pipes until the pressure
gauge shows 0 kg/cm
2
(0 MPa).
(7) Detach the brazed part of the suction and the discharge
pipe connected with compressor.
(8) Remove the compressor nuts.
(9) Remove the compressor.
(10) Detach the brazed parts of 4-way valve and pipe. (Photo 6)
73
Brazed part of
the discharge pipe
Brazed part of
the suction pipe
Discharge temperature
thermistor
Screws of the outdoor fan motor
Propeller fan
Propeller fan
nut
OBH789A
Summary of Contents for MUZ-AP25VG
Page 12: ...12 Unit mm MUZ AP50VG MUZ AP60VG MUZ AP50VGH MUZ AP50VG H MUZ AP60VG OBH789A ...
Page 15: ...15 MUZ AP42VG E1 ET1 E2 ET2 ER2 MUZ AP42VGH E1 E2 OBH789A ...
Page 16: ...16 MUZ AP50VG E1 ET1 MUZ AP50VGH E1 OBH789A ...
Page 17: ...17 MUZ AP60VG E1 ET1 MUZ AP71VG E1 ET1 OBH789A ...
Page 76: ......