
50
12-5. TROUBLESHOOTING FLOW
A How to check inverter/compressor
Refer to 12-5. “Check of compressor
operation time”.
Does the compressor operate continuously?
Refer to 12-5. “Check of compressor start failure”.
OK
No
Yes
Refer to 12-5. “Check of compressor
winding”.
Is the compressor normal?
Replace the compressor.
No
Yes
B Check of open phase
C Check of compressor
● With the connector between the compressor and the
power module (IC700) disconnected, activate the inverter and check if
the inverter is normal by measuring
the voltage balance
between the terminals.
Output voltage is 50 - 130 V. (The voltage may differ according to the tester.)
<< Operation method>>
Start cooling or heating operation by pressing EMERGENCY OPERATION switch on the indoor unit. (TEST RUN OPERA-
TION: Refer to 9-3.)
<<Measurement point>>
At 3 points
BLK (U)-WHT (V)
BLK (U)-RED (W)
WHT(V)-RED (W)
NOTE
: 1. Output voltage varies according to power supply voltage.
2. Measure the voltage by analog type tester.
3. During this check, LED of the inverter P.C. board blinks 9 times. (Refer to 12-6.1.)
Are the voltages balanced?
Disconnect the connector between the compressor
and the power module (IC700).
Replace the inverter P.C. board.
Check the voltage between terminals.
Check the compressor.
See 12-5. “Check of compressor”.
No
Yes
See 12-5. “Check of open phase”.
Measure AC voltage between the lead wires at 3 points.
OBH789A
Summary of Contents for MUZ-AP25VG
Page 12: ...12 Unit mm MUZ AP50VG MUZ AP60VG MUZ AP50VGH MUZ AP50VG H MUZ AP60VG OBH789A ...
Page 15: ...15 MUZ AP42VG E1 ET1 E2 ET2 ER2 MUZ AP42VGH E1 E2 OBH789A ...
Page 16: ...16 MUZ AP50VG E1 ET1 MUZ AP50VGH E1 OBH789A ...
Page 17: ...17 MUZ AP60VG E1 ET1 MUZ AP71VG E1 ET1 OBH789A ...
Page 76: ......