OPERATING PROCEDURE
PHOTOS
7. Removing the line flow fan and the indoor fan
motor
(1) Remove the panel. (Refer to 1.)
(2) Remove the electrical box. (Refer to 2.)
(3) Remove the nozzle. (Refer to 4.)
(4) Disengage the water cover from the catches. (Photo 9)
(5) Remove the screws fixing the motor bed.
(6) Loosen the screw fixing the line flow fan.
(7) Remove the motor bed together with the indoor fan
motor and the motor band.
(8) Disengage the catches on the motor band and remove
the motor band, and pull out the indoor fan motor.
(9) Remove the screws fixing the both sides of the heat
exchanger.
(10) Disengage the catch on the right side on the heat
exchanger.
(11) Lift the heat exchanger, and pull out the line flow fan
upward.
Photo 16
Photo 13
Photo 14
Photo 15
Photo 17
40
Screw of the line flow fan
Screws of the motor bed
Screws of the
heat exchanger
Screw of the
heat exchanger
Catches of the
heat exchanger
2%+%
Summary of Contents for MUFZ-KJ-NAHZ Series
Page 3: ...3 1 TECHNICAL CHANGES MFZ KJ09NA U1 MFZ KJ12NA U1 MFZ KJ15NA U1 MFZ KJ18NA U1 1 New model 2 ...
Page 7: ...7 4 OUTLINES AND DIMENSIONS MFZ KJ09NA MFZ KJ12NA MFZ KJ15NA MFZ KJ18NA Unit inch 2 ...
Page 8: ...8 MFZ KJ09NA MFZ KJ12NA MFZ KJ15NA MFZ KJ18NA 5 WIRING DIAGRAM 2 ...
Page 41: ...41 2 ...