OPERATING PROCEDURE
PHOTOS/FIGURES
7. Removing the vertical vane motor units (R) (L)
and the vertical vane motors (R) (L)
(1) Remove the front panel, horizontal vanes (upper R/L)
(lower R/L), the corner boxes (R) (L), the panels (U)
(R) (L), V.A. clamp, the electrical cover, Wi-Fi assem-
bly, the panel (F), and DISPLAY and i-see SENSOR
ASSEMBLY.
(2) Remove the following connector (Photo 8):
<Indoor electronic control P.C. board>
CN151 (Vane motors)
(3) Pull out the drain hose from the nozzle assembly. Pull
and remove the nozzle assembly (4 catches) (Photo
12).
(4) Cut off the cable tie to secure the lead wires on the
right side of the nozzle assembly (Photo 15).
Removing the horizontal vane motor unit (R) and the ver
-
tical vane motor (R) (Photo 15,16)
(5) Remove the 3 screws of the horizontal motor unit (R)
indicated in (Photo15), and remove the lead wires of
the vane motors (R).
(6) Disengage the catch of the horizontal vane motor unit
(R), and remove the horizontal vane motor unit (R)
(Photo15).
(7) Disengage the link of the vertical vane motor unit (R).
(8) Disengage the catch of the vertical vane motor unit
(R), and remove the vertical vane motor (R) from the
vertical vane motor unit (R), (Photo16-1).
53
Photo 16
Vertical
V
ane motor unit (R)
Link
Screw of the
vertical vane
motor (R)
Photo 15
Catch of the horizontal
vane motor unit (R)
3 screws of the
horizontal
vane motor unit (R)
Cable tie
Photo 16-1
Catch
OBH902A