OPERATING PROCEDURE
PHOTOS/FIGURES
6.
Removing the electrical box
(1) Remove the electrical box cover (See Photo 1 and 2.)
and the connectors (Refer to procedure 5.).
(2) Remove the electrical box fixing screws (M5 × 10: 2
screws). (See Photo 3.)
<Electrical parts in the electrical box>
•
Terminal block for earth and reactor
•
Indoor controller board
•
Thermistor (TH)
(3)
Remove the electrical box (2 hooks).
Photo 6
Photo 7
Photo 9
7.
Removing the turbo fan
(1) Remove the electrical box. (See Photo 3 and refer to
procedure 6)
(2) Remove the bell mouth (tapping screw 4×10: 2 screws).
(See Photo 6.)
(3) Remove the nut and washer (1 nut). (See Photo 7 and 8.)
(4) Remove the turbo fan.
Photo 8
Electrical box
Bell mouth fixing screws
Bell mouth
Turbo fan
Nut and washer
Turn this way to tighten.
Turn this way to loosen.
(The same directions as the fan rotation.)
Rubber mount
Note: When re-attaching the motor mount, make sure
that the thicker and faces the motor shaft.
hooks
Turbo fan
Washer
holes
Protrusions
TCH070A
44
45
Be careful when removing heavy parts.
TCH070A.indd 44
TCH070A.indd 44
7/2/2565 16:46:54
7/2/2565 16:46:54