4
[Wiring Precautions]
[Wiring Precautions]
WARNING
●
Shut off the external power supply (all phases) used in the system before installation and wiring.
Failure to do so may result in electric shock or cause the module to fail or malfunction.
CAUTION
●
Individually ground the FG and LG terminals of the programmable controller with a ground resistance
of 100 ohms or less. Failure to do so may result in electric shock or malfunction.
●
Check the rated voltage and signal layout before wiring to the module, and connect the cables
correctly. Connecting a power supply with a different voltage rating or incorrect wiring may cause fire
or failure.
●
Securely connect the connector to the module. Poor contact may cause malfunction.
●
Do not install the control lines or communication cables together with the main circuit lines or power
cables. Keep a distance of 100mm or more between them. Failure to do so may result in malfunction
due to noise.
●
Place the cables in a duct or clamp them. If not, dangling cables may swing or inadvertently be pulled,
resulting in malfunction or damage to modules or cables.
In addition, the weight of the cables may put stress on modules in an environment of strong vibrations
and shocks.
Do not clamp the extension cables with the jacket stripped. Doing so may change the characteristics
of the cables, resulting in malfunction.
●
Check the interface type and correctly connect the cable. Incorrect wiring (connecting the cable to an
incorrect interface) may cause failure of the module and external device.
●
When disconnecting the cable from the module, do not pull the cable by the cable part. For the cable
with connector, hold the connector part of the cable.
●
Prevent foreign matter such as dust or wire chips from entering the module. Such foreign matter can
cause a fire, failure, or malfunction.
●
Do not apply the 24VDC power before connecting a sensor head. If the power is applied before wiring,
normal data transmission is not guaranteed.
Summary of Contents for MELSENSOR MELSEC iQ-R MH11H01A0LNA
Page 2: ......
Page 57: ...3 MAINTENANCE AND INSPECTION 3 2 Inspection 55 3 MEMO ...
Page 59: ...4 TROUBLESHOOTING 57 4 MEMO ...
Page 75: ...I 73 MEMO ...
Page 79: ......