8
8. Duct connection
DIM.mm
CHANGE
A
B
C
D
E
F
G
H
I
J
A
B
C
D
E
F
G
H
I
J
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
16
15
14
13
12
11
10
9
8
7
6
5
4
3
2
1
SCALE
13
NTS
COMMERCIAL TOLERANCE
WORK
GRADE
CASTING
FINE COARSE
PRESS WORKING
GAS CUTTING A B
SHEARING
A B
MACHINING
MEDIUMCOARSE
E
D
C
B
A
MITSUBISHI ELECTRIC CORPORATION
0.75" MAX
DATE
APPROVED
DRAWN
CHECKED
DESIGNED
3D
CONFIDENTIAL
ITEM
MODEL NAME
1:5
Creo : 0_TOP_ASSY_L_21554B2.drw ( )
The parts are required to meet the latest RoHS directive.
-See the outline drawing for the size of the duct connection.
-Use flanged ducts for connections to return
-Do not use sheetmetal screws longer that 0.75” to secure any
ductwork to the air handler
Summary of Contents for CITY MULTI PVFY-P12
Page 3: ...3 1 Dimensions ...