PHOTOS
32
8. Removing the vane motor
(1) Remove the front panel. (Refer to procedure 2)
(2) Remove the screw of the electrical parts box cover, and
remove the cover.
(3) Remove the 2 screws of the vane motor.
Disconnect the relay connector and remove the motor
from the shaft.
(4) Disconnect the vane motor connector (CN5V) on the
indoor controller board.
Photo 10
Heat exchanger
Vane motor
Nozzle assembly
9. Removing the pipe temperature detection thermistor/liquid
and the pipe temperature detection thermistor/gas
(1) Remove the front panel. (Refer to procedure 2)
(2) Remove the electrical box cover. (See Photo 2)
(3) Remove the water cut. (See Photo 3)
(4) Cut the wiring fixed band.
(5) Remove the pipe temperature detection thermistor/liquid
and the pipe temperature detection thermistor/gas.
(See Photo 10)
(6) Disconnect the connector (CN29) (CN21) on the indoor
controller board.
Photo 11
Heat exchanger
Vane motor fixing
screws
Pipe temperature
detection thermistor/
gas
Pipe temperature
detection thermistor/
liquid
Electrical box
OPERATION PROCEDURE
OCH516B
Summary of Contents for CITY MULTI PKFY-P06NBMU-E2
Page 33: ...33 OCH516B ...