YES
YES
NO
YES
YES
NO
NO
NO
(5)
Heating operation
Normal operations
Defrosting operations
Stop
Test run
1. Indoor unit fan very low speed
operations
2. Inverter output 0Hz
3. Indoor unit LEV
4. Solenoid valve OFF
5. Outdoor unit fan stop
6. BC controller solenoid valve
OFF (PURY)
7. BC controller LEV fully closed
8. 52C off
(PURY)
1. Indoor and outdoor unit fan
control
2. Inverter frequency control
3. Indoor unit LEV
4. Solenoid valve control
5. BC controller solenoid valve
control (PURY)
6. BC controller LEV control
7. 52C control
(PURY)
1. Indoor unit fan stop
2. Inverter defrost frequency control
3. Indoor unit LEV fully opened
4. Solenoid valve control
5. Outdoor unit fan stop
6. BC controller solenoid valve control
(PURY)
7. BC controller LEV control (PUR
8. 52C control
Y)
Heating operation
4-way valve ON
Defrosting
operation
Test run start
4-way valve OFF
Thermostat ON
3-minute
restart
prevention
Note : 1
When outdoor unit starts defrosting, it transmits defrost operations command to (BC controller and) indoor unit, and the
indoor unit starts defrosting operations.
Similarly when defrosting operation stops, indoor unit returns to heating operation after receiving defrost end command of
outdoor unit.
Note : 1
- 66 -
Summary of Contents for CITY MULTI CMB-P1016V-F
Page 18: ... 17 RELAY 10 board RELAY 4 board ...
Page 72: ... 71 ...