5 - 1 5 - 1
MELSEC-GOT
5 ROUGH PRE-OPERATION PROCEDURE
5
5 ROUGH PRE-OPERATION PROCEDURE
This chapter gives a rough procedure to be performed before starting the operation of
the GOT.
START
Create monitor screen data.
Perform wiring to supply power to GOT.
To transfer data through cable
Connect GOT and personal computer by RS-232C cable.
To transfer data through PC card
Load PC card into personal computer.
Load various modules to GOT.
Make switch setting of communication module
or communication board.
Connect cables to GOT and required connectors.
Switch on GOT and connected system.
Start monitoring. (Use various monitoring functions.)
COMPLETE
.......................
....................... Refer to [GT Designer Help
Function]
....................... Refer to [Section 6.1]
Refer to
[GT Works
Version5/GT
Designer
Version5
Reference
Manual
Install GT Designer into personal computer.
Install personal computer-installed OS program
and monitor screen data into GOT.
1) Install basic OS, communication driver, extension
function OS into GOT.
2) Reset GOT power on completion of installation.
3) Download screen data created on personal
computer.
Install personal computer-installed OS program
and monitor screen data to PC card.
1) Copy basic OS, communication driver,
extension function OS to PC card.
2) Copy screen data created on personal computer
to PC card.
Load PC card into GOT, and install OS
program and monitor screen data (copy them to
built-in memory).
....................... Refer to [Chapter 6]
Refer to [GOT-A900 Series
User's Manual
.................... (GT Works Version5
/GT Designer Version5
compatible
Connection System Manual)]
Refer to [GOT-A900 Series
Operating Manual
....................... (GT Works Version5
/GT Designer Version5
compatible
Extended•Option
Functions Manual)]
Install the memory board (only when necessary)
....................... Refer to [Section 6.4]
Refer to [GT Works Version5
/GT Designer Version5
Operating Manual
(Startup Manual)]