
2-1
SECTION 2
INSTALLATION
2.1 UNPACKING, STORAGE, RESHIPMENT
Carefully open the shipping container and remove the equipment.
Weight of the converter is approximately 30 pounds. Inspect the
equipment thoroughly and report any damage.
If the equipment is to be stored, it should be wrapped in plastic
and kept in a clean, dry place.
If the equipment is to be reshipped for any reason, wrap in heavy
plastic and ship in a heavy (275 lb. test), double-wall carton.
At least three inches of a solid packing material should be used
on all sides of the converter. The carton should be marked to
indicate that it contains fragile electronic equipment.
2.2 MOUNTING
The converter chassis is 19" x 22" x 3.5" panel height. Slides
are provided for mounting in a standard 19" (EIA) equipment rack.
The converter should be securely mounted.
2.3 TURN-ON PROCEDURE
After mounting, make all external connections per Table 2-1.
Refer to Section 1 for the physical configuration of the
converter.
Apply power to the converter using the front panel power On/Off
switch.
Allow one half hour minimum for oven warm-up in the internal
crystal oscillator.
All LO fault lights should be off.
System is now operational.
Summary of Contents for D-9301
Page 17: ......
Page 19: ......
Page 21: ......
Page 34: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 47: ......
Page 51: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ......
Page 83: ......
Page 84: ......
Page 85: ......
Page 86: ......